Place of Origin: | CHINA |
Brand Name: | hongbang |
Certification: | CE ISO |
Model Number: | EX470,CAT345 |
Minimum Order Quantity: | 1 piece |
---|---|
Price: | 2000-50000usd |
Packaging Details: | bubble package |
Delivery Time: | 10-20days |
Payment Terms: | L/C |
Supply Ability: | 50pcs/month |
Material: | Q345 | Application: | Steel Plate Pile Driver |
---|---|---|---|
Pile Height: | 12-18 Meter Steel Plate | Efficient: | High |
Processing: | Advanced Equipment | Producing Time: | 15 Day |
High Light: | excavator mounted vibratory hammer,hydraulic vibratory hammer |
oem supply excavator vibro hammer pile hammer with long boom for steel sheet pile concrete pile
Products application
The efficient of vibration pile method is higher than other methods. It is mainly applied to steel sheet pile, steel pipe pile and long slender concrete precast pile within 8 meters. This pile driving method is the most suitable for working in sand and poorer effect in the clay which must select higher power model machines.
Performance parameter
Model | V-250D | V-300E | V-330E | V-350E | V-400D | V-450B | V-500A |
Vibration frequency(rpm) | 2800 | 3000 | 3000 | 3000 | 2600 | 2600 | 2600 |
Vibrating force(T) | 39.5 | 48 | 51 | 53.4 | 55.5 | 58 | 63 |
Hydraulic system operating pressure(Bar) | 300 | 300 | 300 | 300 | 300 | 300 | 300 |
Hydraulic system flow demand(Lpm) | 175 | 240 | 270 | 270 | 280 | 300 | 320 |
Main body weight(T) | 1.55 | 1.65 | 1.65 | 1.8 | 2 | 2.05 | 2.1 |
Apply to excavator weight(T) | 20-24 | 24-30 | 30-35 | 35-40 | 38-42 | 40-45 | 48< |
Clip mouth weight(kg) | C15:455kg; C16E:530kg; C18E:578kg C30B:455kg; C35B:530kg | ||||||
Assistant arm weight(kg) | A200:500kg; A250B:600kg A350:900kg |
Contact Person: Mr. Roger
Tel: +8615989695351
Address: Shi wan town .bo luo county, hui zhou city ,Guangdong province of China
Factory Address:Shi wan town .bo luo county, hui zhou city ,Guangdong province of China