-
Excavator Boom Arm
-
Long Reach Excavator Booms
-
Excavator Telescopic Boom
-
Demolition Boom
-
Excavator Pile Driving
-
Excavator Rock Bucket
-
Excavator Rock Ripper
-
Excavator Tunnel Boom
-
Mechanical Excavator Grab
-
Hydraulic Log Grapple
-
Excavator Sliding Arm
-
Excavator Standard Arm
-
Excavator Thumb Bucket
-
Ditch Cleaning Bucket
-
Excavator Tilt Bucket
-
Excavator Skeleton Bucket
-
David CordovaHigh quality excavator boom with good price! I like it very much, so I brought 2 units of demolition arm again. The whole process went smoothly. Next time I need to buy excavator arms, I will buy them from here.
-
Vaina ConroyVery happy with the service provided. All questions were answered promptly. The product was as described and arrived on time. Great packaging. The biggest surprise was that the welding quality of the product exceeded my expectations.
-
William HollisterVery helpful. The excavator long reach arm I purchased are solidly built, well made and I have no doubt they will last for many years.
Thickened 40-47T Excavator Pile Driver For KOMATSU DOOSAN VOLVO
Material | Q355B | Colour | Custom |
---|---|---|---|
Boom Weight | 3550 | Arm Weight | 1400 |
Length | 13-14.2 | Warranty | 6 Months |
High Light | Thickened Excavator Pile Driver,DOOSAN Excavator Pile Driver,VOLVO Excavator Mounted Sheet Pile Driver |
2022 wholesale 40-47T pile driver arm For SANY CAT HITACHI KOMATSU DOOSAN VOLVO CASE
The large arm of this piling arm is very straight, and the oil cylinder connecting the large arm and the forearm is changed to the lower part of the large forearm, so it is relatively high to lift. A 12.8 meter long arm is needed to drive 12 meters of steel sheet pile. The long arm of the excavator is 9 meters long, and the short arm is 3.8 meters long.
Piling arm manufacturer: Driving 15 meters of steel sheet pile only need to make 16 meters of extension arm. The long arm of the excavator is 11 meters long, and the short arm is 5 meters long. According to the customer model and the different pile hammer, some times to appropriate add a counterweight, in addition to the number of different pile hammer pipeline and joint are not the same, some also need to change the double pump confluence.