Product Details:
|
Type: | Excavator High Reach Demolition Boom | Condition: | High Quality, Perfect New |
---|---|---|---|
Warranty: | 0-6 Months | After-sales Service Provided: | Online Quick Reply |
Application: | Crawler Excavator,bucket Cylinder,H Links,bucket | Maximum Length: | 18-30 Meters |
Counterweight: | Accordance | Main Material: | Q355B, Q690D Are Optional |
High Light: | Demolition Boom For Excavator,18 Meters Demolition Boom,30 Meters Excavator Demolition |
Catalogue ZH excavator boom arm.pdf
1. 14000㎡ Workshop with Precision Equipments
We has more than 14000㎡ steel structure standard workshop with a large number of high precision processing equipments.
2. High-tech R&D Team
We use precision drawing software to achieve the max working range under the premise of safe operation.
3. Experienced Workers
There are more than 60 skillful staffs, 30 welding workers with over 5 years welding experience.
4. Customization
(1)Match all brand excavator.
(2)Color, length, material can do according to you.
(3)Extra pipeline can be added to suit to some extra application.
5. Prompt Lead Time
(1)Our lead time is 7-15 days.
(2)Our annual output of various types of excavator boom arms can reach 600 sets.
6. Excellent Service
(1)24 hours online service.
(2)Can make an appointment for technical video support.
CE certification & Utility model patent certificates
The excavator demolition boom is a group of an excavator's working device. In particular, a section of middle arm is added. It is specially designed to increase the safe distance between the cockpit and the working parts, which is designed to three sections or multi sections generally.
1. Q355B as default, Q690D optional.
2. Key Force-bearing Parts are Reinforced.
3. Welding is full and smooth.
4. Adopt national standard precision pipelines.
5. Boom bushing come with an alloy copper sleeve(with self-lubricating carbon powder inside).
6. Boom and sticks' angle can be opened to achive 180°
1.Tell us your excavator model and working situation
2. We will send you a quota within 2 days after received your details
3. Check sumilation parameters
4. Make sure Performa Invoice
5. Done a payment
6. Production period
7. Video inspection after product done
8. Shipping period
9. Gain the product.
Excavator Ton | Total Length(mm) | (A)Transport Height(mm) | (B)Maximum Lifting Height(mm) | Limit weight of hydraulic shear(kg) | Cylinder(Ton) | Counterweight(Ton) |
25T | 16000 | 3160 | 14900 | 2000 | 20T | 4T |
30T | 18000 | 3300 | 17000 | 2000 | 20T | 4.5T |
35T | 20000 | 3300 | 19000 | 2000 | 20T | 4.5T |
40T | 22000 | 3400 | 21050 | 2000 | 20T | 5T |
45T | 24000 | 3400 | 23100 | 2000 | 20T | 5T |
Contact Person: Miss. Katherine
Tel: +8618127538971