Product Details:
|
Type: | Pile Driving Excavator Boom | Warranty: | 180 Days |
---|---|---|---|
After-sales Service Provided: | Prompt Online Reply | Maximum Length: | 18-20 Meters |
Extra Counterweight: | Up To Your Machine | Working Part: | Vibro Hammer |
Highlight: | Earthmoving Boom And Stick,Pile Driving Boom And Stick,Timber Excavator Pile Driving |
Catalogue ZH excavator boom arm.pdf
14000㎡ Workshop with Precision Equipments | High-tech R&D Team with 10+ Years Experience |
Experienced Welding Workers | Deep Customization |
Prompt Lead Time 7-20 Days | Excellent Service Within 24 Hours |
Excavator piling arm is a kind of excavator lengthening arm for piling. The standard arm of conventional excavator can only play 6 meters of pile. By changing the middle hole of the big arm to the lower part of the big arm, it can only barely play 9 meters of pile.
The pile driving arm is straight, and the bucket rod cylinder is changed to the lower part of the arm, so it can reach higher.
The application range of excavator pile driving arm
1, highway guardrail drilling, piling, pulling pile
2, photovoltaic power plant screw pile installation
3. Pile driving in various other sites (such as farms, pastures, orchards, etc.)
4. Highway field engineering construction
5- The integration design of pile driving and drilling is adopted to realize the multi-use of one machine
1. Increased efficiency: One of the main advantages of an excavator pile driving arm is its increased efficiency. By allowing operators to drive piles directly from the excavator, pile driving tasks can be completed more quickly and efficiently, reducing the time and cost associated with this type of work.
2. Versatility: Excavator pile driving arms are highly versatile attachments. They can be used for a wide range of pile driving tasks, from constructing foundations to building retaining walls and other structures.
3. Increased accuracy: Excavator pile driving arms are designed for precision and accuracy. With their hydraulic controls and adjustable settings, operators can ensure that each pile is driven to the correct depth and angle, improving overall accuracy and reducing the risk of errors and rework.
Excavator(Ton) | Total Length(mm) | (A)Boom(mm) | (B)Arm(mm) | (C)Piling Height)(mm) | Counterweight(Ton) |
30-36T | 13800 | 10000 | 3800 | 15400 | 3T |
30-36T | 15000 | 10500 | 4500 | 17100 | 5T |
40-45T | 15800 | 11000 | 4800 | 17900 | 3T |
40-45T | 16800 | 11500 | 5300 | 18500 | 5T-6T |
45-50T | 19000 | 12500 | 6500 | 21000 | 6T-7T |
Please tell us your excavator model number and the pile length, so that we can give you suggestion asap.
CE certification & Utility model patent certificates
Contact Person: Katherine
Tel: +8618127538971