Product Details:
|
Condition: | 100% *Brand New | Material: | Q355B/Q690D Optional |
---|---|---|---|
Application: | All Brand Excavator Available | Length: | 12-30 Optional |
Payment Terms: | T/T, Discussion | Delivery Time: | 15 Working Days |
Packaging Details: | Bubble Bag Packing | Certification: | CE Certificate |
Brand Name: | Zhonghe | Place Of Origin: | China |
Supply Ability: | 50 Piece/Pieces Per Month | Port: | Guangzhou (Port) |
Highlight: | Excavator Extension Arm,Excavator Extension Arm ZX240-3,Demolition Boom 18M |
Hi all, I'm Sophia from Zhonghe Machinery,
Here is pictures of our 18Meters high reach for Hitachi ZX240-3
we also sell these products :
✅Long Reach boom
✅High reach demolition boom
✅Telescopic dipper arm
✅ Excavator Sliding arm
✅ Bucket
Any interested can PM me, all product own CE certification.
Kaiping Zhonghe Machinery Manufacturing Co.Ltd
9 Huancui West Road, Cuishanhu New Area, Kaiping City, Guangdong Province, China
H/P & WhatApps : +8618127591702 Sophia Situ
Office : +86 750 2889907
Weight | Model | Part Length | Total length(m) | Weight(kg) | Maximum removal height(m) |
Total Length(mm) | 25T | 8.5 | 16 | 2800 | 16M |
Boom(A)(mm) | 2.3 | 900 | |||
Arm(b)(mm) | 5.2 | 1700 | |||
Maximum Digger Radius(C)(mm) | 30T | 9.5 | 18 | 3000 | 18M |
Maximum Digger Depth(C)(mm) | 2.3 | 1000 | |||
Maximum Unloading Height(E)(mm) | 5.2 | 1950 | |||
Maximum Digger Height(F)(mm) | 35T | 10.5 | 20 | 3500 | 20M |
Bucket Volume(m³) | 2.3 | 1100 |
Advantages of long reach demolition for excavator
Customized:
1. Suitable for all brands of excavators.
2. Color, length and material can be made according to your requirements.
3. Additional pipes can be added to accommodate some additional applications.
4. If the customer needs it, we can also provide boom cylinder and rod cylinder.
Strong production capacity:
We can produce 50 sets of excavator booms per month.
The annual output of all kinds of excavator arms can reach 600 sets.
Good service:
1. Online support within 24 hours.
2. Schedule a video technical support appointment.
(Our engineers specialize in excavator booms and accessories for more than 10 years)
3. The excavator arm should be two/three sections to make it suitable for loading into the container to save transportation costs.
Contact Person: Mr. kelvin
Tel: +8615362217237